2023 MOCs and MFRs

23 LMN 15 T2 MFR Cooler Repair Extended Time Notification
23 LMN 14 MOC Possible Noise Near South Fishway
23 LMN 13 MRF Overshoot spill makeup Update
23 LMN 12 MRF Spillbay 5 and 7 Repairs
23 LMN 11 MRF Spillgate 8 RSW Repairs
23 LMN 10 MOC T2 Commissioning and Load Testing
23 LMN 09 MOC Unit 4 Testing
23 LMN 08 MFR Spillbay 5 OOS
23 LMN 07 Emergency Debris Spill
23 LMN 06 Fish Loss from Debris Blockage

23 LMN 04 MOC Spillbay 6 Repairs
23 LMN 03 MFR Spillbay 8 OOS
23 LMN 02 MFR Fish Loss Gatewell 2B
23 LMN 01 MOC PNNL Receiver
2022 MOCs and MFRs

22 LMN 09 MOC T-2 Rehabilitation
22 LMN 08 MFR Spillway Gate 5
22 LMN 07 MOC Spillbay Outages to Install Sensors
22 LMN 06 MOC BPA Outage 500kV Lines
22 LMN 05 MFR Spillway Gate 7
22 LMN 04 MFR Spillway gates 3-5 couplers
22 LMN 03 MFR Spillbays 1, 2, 6, 7 OOS
22 LMN 02 MFR Fish Pump 1 OOS
22 LMN 01 MOC North Fish Ladder Debris Barrier

2021 MOCs and MFRs
21 LMN 07 MFR Spillbay 3 OOS
21 LMN 06 MOC North Fish Ladder Debris Barrier Anchor Block
21 LMN 05 MOC Unit 3 Exciter Upgrade Comissioning-Testing
21 LMN 04 MOC Unit 2 Digital Governor Installation and Testing
21 LMN 03 MOC Spillgate Gearbox Replacement
21 LMN 02 MFR Every other day sampling
21 LMN 01 MFR Orifice Gallery

2020 MOCs and MFRs
20 LMN 08 MOC-Floating Guide Wall Cable Emergency Repair
20 LMN 07 MFR-Early closing of RSW
20 LMN 06 MFR Fish Pump Outage2
20 LMN 05 MFR-Unit Priority Deviation for Troubleshooting Alarm
20 LMN 04 MFR-Delayed Opening of RSW
20 LMN 02 MOC Unit Priority Change
20LMN01 MFR Units 4&5 Fixed Blades

2019 MOCs and MFRs
19 LMN 11 MFR - Temporary Change to Primary Bypass
19 LMN 010 MFR Failing Bird Sprinkler Motor and Pump
19 LMN 09 MOC RSW outage for Tail log_
19 LMN 08 MFR Delayed Opening of RSW
19 LMN 07 MOC Fish Pump Outage for Bulkhead Inspection
19 LMN 06 MFR Delayed Opening of RSW
19 LMN 05 MFR - Bypass of Fish
19 LMN 04 MFR - Raceway 3 mortality
19 LMN 02 MFR Sample Delay
19 LMN 01 MOC-FGE Study Unit Priority and Headgate Position Changes

2018 MOCs and MFRs
18 LMN 10 Emergency Fish Pump Outage
18 LMN 09 Emergency Fish Pump Outage_
18 LMN 08 MFR Emergency Fish Pump Outage
18 LMN 07 MOC digital governor
18 LMN 06 MOC Penstock Closure
18 LMN 05 MFR Spring to Summer Spill Pattern Transition
18 LMN 03 MFR Separator Exit

2017 MOCs and MFRs

17 LMN 13 Lower Monumental Unit 4 Blade Position
17 LMN 12 unit priority
17 LMN 11 MFR Unit 2 blade position
17 LMN 10 MOC Unit 3 Blade Position
17 LMN 09 MFR Unit 6 STS Stationary
17 LMN 08 MOC walleye removal
17 LMN 07 MOC digital governor
17 LMN 06 MFR Emergency debris spill
17 LMN 05 MFR Separator Exit Debris Blockage updated
17 LMN 04 MFR debris mortalities
17 LMN 03 barge dock revised
17 LMN 02 MFR Sturgeon Intake Rack
17 LMN 01 Ladder Outage

2016 MOCs and MFRs

16 LMN 04 MFR Spillgate 2 Failure

2015 MOCs and MFRs
15MCN06 MFR Change in Unit Priority
15LMN05 MFR Low flow spill implementation
15LMN04 MFR North upper fishladder walkway mort
2014 MOCs and MFRs
14LMN06 MFR Fish Loss at North ladder walkway



14LMN02 U5 exciter repair and testing revision #2
14LMN01 MFR Adult Fish Ladder PLC failure updated

2013 MOCs and MFRs
13LMN03 Transformer PM and Relay Installation
13LMN03 Battelle Fish Mort
13LMN02 Unit 1 priority change
13LMN01 Hydrocannon Repair

2012 MOCs and MFRs
12LMN011 Dive to Remove STS Screen
12LMN010 Unit 4 six year RTS test
12LMN09 Spill Bay 1 2 Outage Ladder Exit Debris Removal
12LMN08 Unit 4 Test
12LMN07 Diesel Generator Update
12LMN06 Woody Debris Spill
12LMN05 Summer Spill Change 12LMN04 STS fish mortality
12LMN04 spill 04122012
12LMN02 diesel generator #2
12LMN01 Diesel Generator Installation

2011 MOCs and MFRs
110916 LMN changes in JFF operations
110223 LMN south fish ladder outage extension

2010 MOCs and MFRs

2009 MOCs and MFRs
090213 LMN 19-20 Feb

2008 MOCs and MFRs